Piyaz lifecycle rules
How tasks move through state, what each state means, the Completion Protocol (with PR-opening), and the propagation Iron Law.
Agents read this file before any status transition, before marking a task done or cancelled, and after every status change to propagate.
1. Status lifecycle
draft → planned → in_progress → in_review → done
cancelled (terminal, reachable from any non-terminal)Summary
| Status | Required fields | Forbidden fields | Trigger to leave |
|---|---|---|---|
draft | description, acceptanceCriteria | executionRecord, implementationPlan | implementation plan saved → planned |
planned | + implementationPlan (unabridged); all depends_on blockers done | executionRecord | someone claims via action='update' status='in_progress' → in_progress |
in_progress | + active worker (one only) | - | work complete + record + ACs + Completion Protocol §2 run → in_review |
in_review | + executionRecord, decisions, files, every AC evaluated, prUrl (optional sugar, when a PR was opened; backend upserts a task_links row with kind='pull_request') | - | HOTL operator inspects PR and flips → done (or back to in_progress for rework) |
done | (inherited from in_review) | - | terminal |
cancelled | + executionRecord (rationale + what was tried), decisions | - | terminal |
draft
- What it means. Scope captured. The task is real but unbuilt.
- Cannot: be coded directly. Needs planning first.
- Transitions to
planned: when an implementation plan is written and saved on the task. The plan must be unabridged. Do not save summaries.
planned
- What it means. Implementation plan is written. All
depends_onblockers are themselvesdone. Ready for someone to claim and code. - Transitions to
in_progress: when someone explicitly claims viapiyaz_task action='update' status='in_progress'. Claim BEFORE starting work; this prevents two agents from grabbing the same task.
in_progress
- What it means. Active implementation. Exactly one engineer or agent is working on it.
- Constraint: should not span sessions. If work pauses, leave a note in the task or move it back to
planned. - Transitions to
in_review: when implementation is complete,executionRecord/decisions/filesare populated, acceptance criteria are evaluated, and the Completion Protocol (§2) has run.
in_review
- What it means. Implementer subagent has finished the work, opened a PR, and populated the full Completion Protocol payload (
executionRecord,decisions,files, evaluatedacceptanceCriteria). Tests, lint, and typecheck are green. Awaiting human review on the PR. - Cannot: be self-promoted to
doneby any agent. The HOTL operator owns thein_review → donetransition. - Transitions to
done: when the PR is approved/merged and the operator updates status. No additional payload is required; the implementer already populated everything. - Transitions back to
in_progress: when the reviewer requests rework. The implementer or a follow-up worker picks the task up again fromin_progress.
done (terminal)
- What it means. Shipped and approved. The PR is merged (or otherwise accepted) and the HOTL operator has flipped the task from
in_review. Carries the full record:executionRecord(3-5 sentences on what was built),decisions(one-liner per choice),files(every path touched),acceptanceCriteriawith each item evaluated (checked: trueorfalse). - Effect on graph: downstream tasks unblock when their
depends_onchain reachesdone. If a downstream still appears blocked, run propagation (§3); the chain may pass through a partially-done sub-graph.
cancelled (terminal, reachable from any non-terminal state)
- What it means. Abandoned work. Carries
executionRecord(rationale: why abandoned, what was tried) anddecisions(anything learned). - Transparent in the dependency graph. Passable but never satisfying. A dependent only becomes unblocked when every active task reachable through cancelled middles is
done. - Excluded from: progress percentages, critical-path calculations, blocked listings.
2. Completion Protocol
Before transitioning a task to in_review, done, or cancelled:
2.1. Detect mode by transcript
- Dispatched mode: your context shows you were invoked via the Task tool by a parent agent. Mark
in_reviewdirectly with the full payload (the implementer's terminal write); the HOTL operator finalizes todone. Return to the parent with the task ref and a one-sentence summary. Do not ask. - Direct mode: invoked by the user in a normal session. Ask "Ready to mark this
in_review?" with a one-sentence executionRecord preview. Wait for explicit confirmation; the HOTL operator finalizes todoneafter PR approval. - Uncertain: default to asking. A spurious confirmation prompt is cheap; an unauthorized status change is expensive.
2.2. Populate the required fields
executionRecord, decisions, files, acceptanceCriteria, plus prUrl when a PR was opened (backend upserts a task_links row with kind='pull_request' so the review subagent and detail UI can resolve the PR). The MCP server returns _hints if any are missing. Re-call with the additions before continuing.
For pure spec-review / docs / decision-only / Piyaz-only refinement tasks that touched no repo files, pass files=[] explicitly. Omitting the field leaves the prior value in place and the server's "missing files" hint will not clear. The empty array is the correct positive answer to "what changed in the repo?", not the absence of an answer.
2.3. Open a PR if the work changed code
If files is non-empty AND the work was a real code change (not research, not decision-only, not Piyaz-only refinement):
Detect a PR template in the repo at one of these paths (or similar):
.github/PULL_REQUEST_TEMPLATE.md.github/pull_request_template.md.github/PULL_REQUEST_TEMPLATE/<name>.mddocs/pull_request_template.md
If a template exists: fill it. Map task fields onto template sections only where they fit. Leave a section blank rather than invent content. Common mappings:
- Linked issue / linked task: include the
taskRefin[BRACKETS](e.g.[MYMR-83]). Bracket form triggers Piyaz PR-status tracking; use it for the ONE primary task this PR builds. Reference any related tasks elsewhere as plain links (no brackets). AddCloses #Non its own line if a GitHub issue is being resolved. - Summary section: 2 to 3 sentences from
executionRecord. - Test plan / verification section: the
acceptanceCriteriaitems that are checked. - Decisions or notes-for-reviewer section if present: relevant entries from
decisions.
If no template exists: use this concise default.
## Summary
**Task Reference**: [MYMR-XXX]
<!-- The ONE primary task this PR builds. Brackets trigger Piyaz
PR-status tracking. Use them only here. Reference any related
tasks elsewhere as plain links (no brackets). -->
<!-- What does this PR change and why? If it resolves a GitHub issue,
add "Closes #N" on its own line. -->
## Type of change
- [ ] Bug fix
- [ ] New feature
- [ ] Refactor / cleanup
- [ ] Documentation
## Testing
- [ ] Tested locally with `<command>`
- [ ] Linting and formatting pass (`<command>`)
- [ ] Type or build check passes (`<command>`)
## Notes for reviewer
<!-- Anything non-obvious: tradeoffs, follow-up work, alternatives
considered. Skip if there is nothing useful to add. -->Open the PR with gh pr create --title '<task title>' --body "$(cat <<'EOF' ... EOF)".
Always concise. Do not pad sections to look thorough. Empty optional sections beat fabricated content. If the template has prompt questions you cannot answer, skip them rather than make answers up.
2.4. Skip the PR for these task types
- Research / investigation tasks (no code change).
- Decision-only tasks.
- Pure-Piyaz refinement tasks (no repo changes).
- Tasks the user explicitly said "no PR" on.
- Data and BA work without a code repo (a Looker dashboard tweak applied via the Looker UI, a Tableau workbook published from Desktop, a metric definition signed off in a doc, an ad-hoc SQL analysis attached to a ticket, a BRD update in Confluence). In these cases the deliverable lives outside git; record the artifact link or path in
executionRecordandfilesinstead of opening a PR. When the data work IS in a git repo (a dbt project, a SQL repo, a notebook collection under version control), open a PR per the standard rules above.
When in doubt, ask the user before opening.
3. Propagate after every change (Iron Law)
A change that does not propagate did not happen.The graph is Piyaz's value. Skip once and it lies: ready tasks that aren't ready, blockers pointing at shipped work, every future session picking the wrong next step.
After any status change or significant refinement:
piyaz_query type='edges'on the changed task. Current relationships.piyaz_analyze type='downstream'. Who depends on this task.- For each downstream task, evaluate:
- Do edge notes need updating to reflect new decisions?
- Are there NEW relationships revealed by this change?
- Are there STALE relationships that no longer hold?
- Do downstream descriptions need updating based on the decisions made?
- Create, update, or remove edges as needed.
For cancellations specifically:
- Edges to a cancelled task remain in place. Cancellation is transitive-aware.
- The question to answer is: is there a replacement?
- Yes (a new task supersedes the cancelled one): rewire dependents to point at the replacement.
- No (the scope is genuinely abandoned): dependents may need to be cancelled too, or re-scoped to no longer require the cancelled work.
Skipping propagation is how dependency graphs go stale. Stale graphs make Piyaz useless.